{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:company:mapna-group",
    "identifier": "hg:company:mapna-group",
    "dataset_type": "entity_dataset",
    "entity_type": "company",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:16+00:00",
    "name": "MAPNA Group",
    "slug": "mapna-group",
    "status": "publish",
    "url": "https://hormuz.group/companies/mapna-group/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/company/mapna-group.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/company/mapna-group",
    "summary": "",
    "machine_summary": "MAPNA Group MAPNA Group is one of Iran’s most important engineering and industrial groups, headquartered in Tehran and active across power, energy, rail, and heavy equipment sectors. Its relevance comes from project execution capability, domestic equipment manufacturing, public infrastructure exposure, and deep links to Iran’s power-supply system. For Hormuz Group, MAPNA is a key reference asset for understanding energy bottlenecks, industrial procurement, local engineering capacity, technology gaps, and the feasibility of infrastructure development under sanctions and financing constraints. In the Hormuz investment graph, MAPNA connects power generation, industrial engineering, equipment supply, public projects, rail and energy infrastructure, and procurement-risk analysis. It is useful for screening power-sector opportunities, infrastructure bottlenecks, local supplier depth, project-execution capacity, and import-substitution dynamics in industrial equipment. Foreign-facing analysis should treat MAPNA as a strategically relevant engineering benchmark, while verifying current project exposure, counterparties, sanctions constraints, financing conditions, technology dependencies, and procurement channels before commercial reliance. MAPNA Group provides engineering, procurement, construction, equipment manufacturing, project development, maintenance, and industrial services across power generation, oil and gas, rail transport, renewable energy, and heavy industrial systems. Its activities connect turbines, power plants, grid-related infrastructure, industrial equipment, public projects, and energy-sector supply chains. province: Tehran industry: Energy, Engineering, Industrial Equipment, Power market: Enterprise Demand, Power, Public Projects, Supply Chains challenges: Compliance, Energy Supply, Procurement Risk, Sanctions company_type: Engineering Company, Public Company, Service Provider city: Tehran",
    "published_at": "2026-06-28T18:08:24+00:00",
    "modified_at": "2026-06-28T18:08:24+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 3,
                "name": "Tehran",
                "slug": "tehran",
                "url": "https://hormuz.group/provinces/tehran/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 107,
                "name": "Engineering",
                "slug": "engineering",
                "url": "https://hormuz.group/industry/construction/engineering/"
            },
            {
                "id": 251,
                "name": "Industrial Equipment",
                "slug": "industrial-equipment",
                "url": "https://hormuz.group/industry/manufacturing/industrial-equipment/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 40,
                "name": "Enterprise Demand",
                "slug": "enterprise-demand",
                "url": "https://hormuz.group/market/enterprise-demand/"
            },
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            },
            {
                "id": 76,
                "name": "Supply Chains",
                "slug": "supply-chains",
                "url": "https://hormuz.group/market/enterprise-demand/supply-chains/"
            }
        ],
        "challenges": [
            {
                "id": 164,
                "name": "Compliance",
                "slug": "compliance",
                "url": "https://hormuz.group/challenges/regulatory-barriers/compliance/"
            },
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 186,
                "name": "Procurement Risk",
                "slug": "procurement-risk",
                "url": "https://hormuz.group/challenges/operational-risks/procurement-risk/"
            },
            {
                "id": 163,
                "name": "Sanctions",
                "slug": "sanctions",
                "url": "https://hormuz.group/challenges/regulatory-barriers/sanctions/"
            }
        ],
        "company_type": [
            {
                "id": 304,
                "name": "Engineering Company",
                "slug": "engineering-company",
                "url": "https://hormuz.group/company-type/engineering-company/"
            },
            {
                "id": 306,
                "name": "Public Company",
                "slug": "public-company",
                "url": "https://hormuz.group/company-type/public-company/"
            },
            {
                "id": 303,
                "name": "Service Provider",
                "slug": "service-provider",
                "url": "https://hormuz.group/company-type/service-provider/"
            }
        ],
        "city": [
            {
                "id": 384,
                "name": "Tehran",
                "slug": "tehran",
                "url": "https://hormuz.group/cities/tehran/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "Tehran",
        "industry": "Energy, Engineering, Industrial Equipment, Power",
        "market": "Enterprise Demand, Power, Public Projects, Supply Chains",
        "challenges": "Compliance, Energy Supply, Procurement Risk, Sanctions",
        "company_type": "Engineering Company, Public Company, Service Provider",
        "city": "Tehran"
    },
    "fields_summary": {
        "legal_name": "MAPNA Group",
        "website": "https://mapnagroup.com",
        "city": "Tehran, Tehran Province, Iran",
        "ticker_symbol": "رمپنا",
        "listing_status": "listed_tse",
        "products_services": "MAPNA Group provides engineering, procurement, construction, equipment manufacturing, project development, maintenance, and industrial services across power generation, oil and gas, rail transport, renewable energy, and heavy industrial systems. Its activities connect turbines, power plants, grid-related infrastructure, industrial equipment, public projects, and energy-sector supply chains.",
        "export_relevance": "medium",
        "short_profile": "MAPNA Group is one of Iran’s most important engineering and industrial groups, headquartered in Tehran and active across power, energy, rail, and heavy equipment sectors. Its relevance comes from project execution capability, domestic equipment manufacturing, public infrastructure exposure, and deep links to Iran’s power-supply system. For Hormuz Group, MAPNA is a key reference asset for understanding energy bottlenecks, industrial procurement, local engineering capacity, technology gaps, and the feasibility of infrastructure development under sanctions and financing constraints.",
        "investment_relevance": "In the Hormuz investment graph, MAPNA connects power generation, industrial engineering, equipment supply, public projects, rail and energy infrastructure, and procurement-risk analysis. It is useful for screening power-sector opportunities, infrastructure bottlenecks, local supplier depth, project-execution capacity, and import-substitution dynamics in industrial equipment. Foreign-facing analysis should treat MAPNA as a strategically relevant engineering benchmark, while verifying current project exposure, counterparties, sanctions constraints, financing conditions, technology dependencies, and procurement channels before commercial reliance."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "legal_name": "MAPNA Group",
        "city": "Tehran, Tehran Province, Iran",
        "ticker_symbol": "رمپنا",
        "export_relevance": "medium",
        "verification_status": "basic",
        "data_confidence": "high",
        "listing_status": "listed_tse",
        "last_updated": "28/06/2026",
        "website": "https://mapnagroup.com",
        "products_services": "MAPNA Group provides engineering, procurement, construction, equipment manufacturing, project development, maintenance, and industrial services across power generation, oil and gas, rail transport, renewable energy, and heavy industrial systems. Its activities connect turbines, power plants, grid-related infrastructure, industrial equipment, public projects, and energy-sector supply chains.",
        "short_profile": "MAPNA Group is one of Iran’s most important engineering and industrial groups, headquartered in Tehran and active across power, energy, rail, and heavy equipment sectors. Its relevance comes from project execution capability, domestic equipment manufacturing, public infrastructure exposure, and deep links to Iran’s power-supply system. For Hormuz Group, MAPNA is a key reference asset for understanding energy bottlenecks, industrial procurement, local engineering capacity, technology gaps, and the feasibility of infrastructure development under sanctions and financing constraints.",
        "investment_relevance": "In the Hormuz investment graph, MAPNA connects power generation, industrial engineering, equipment supply, public projects, rail and energy infrastructure, and procurement-risk analysis. It is useful for screening power-sector opportunities, infrastructure bottlenecks, local supplier depth, project-execution capacity, and import-substitution dynamics in industrial equipment. Foreign-facing analysis should treat MAPNA as a strategically relevant engineering benchmark, while verifying current project exposure, counterparties, sanctions constraints, financing conditions, technology dependencies, and procurement channels before commercial reliance.",
        "source_note": "Based on public company, market, sector, and disclosure-related information. Further verification is required before treating this profile as verified investment intelligence."
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "legal_name": {
            "type": "string",
            "present": true,
            "length": 11
        },
        "city": {
            "type": "string",
            "present": true,
            "length": 29
        },
        "ticker_symbol": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "export_relevance": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 4
        },
        "listing_status": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "website": {
            "type": "string",
            "present": true,
            "length": 22
        },
        "products_services": {
            "type": "string",
            "present": true,
            "length": 393
        },
        "short_profile": {
            "type": "string",
            "present": true,
            "length": 590
        },
        "investment_relevance": {
            "type": "string",
            "present": true,
            "length": 652
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 175
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public company, market, sector, and disclosure-related information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "legal_name",
            "website",
            "city",
            "listing_status",
            "products_services",
            "export_relevance",
            "verification_status",
            "data_confidence",
            "short_profile",
            "investment_relevance",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "high",
        "last_updated": "28/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "high",
        "last_updated": "28/06/2026"
    }
}