{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:infrastructure:kazerun-combined-cycle-power-plant",
    "identifier": "hg:infrastructure:kazerun-combined-cycle-power-plant",
    "dataset_type": "entity_dataset",
    "entity_type": "infrastructure",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:18+00:00",
    "name": "Kazerun Combined Cycle Power Plant",
    "slug": "kazerun-combined-cycle-power-plant",
    "status": "publish",
    "url": "https://hormuz.group/infrastructure/kazerun-combined-cycle-power-plant/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/infrastructure/kazerun-combined-cycle-power-plant.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/infrastructure/kazerun-combined-cycle-power-plant",
    "summary": "",
    "machine_summary": "Kazerun Combined Cycle Power Plant Kazerun Combined Cycle Power Plant is relevant in the Hormuz Graph as a thermal power asset serving Fars Province’s western corridor, where electricity demand is shaped by urban growth, agriculture, industry, and transport links between Shiraz, Bushehr, and Khuzestan-facing routes. Its role connects gas-fired generation, grid reliability, public infrastructure, and regional operating conditions for businesses outside the main Shiraz metropolitan area. The asset is important for understanding how power supply supports provincial industry and services in a region exposed to seasonal demand and national power shortages. Kazerun Combined Cycle Power Plant Kazerun, Fars Province, Iran province: Fars industry: Energy, Power market: Power, Public Projects challenges: Energy Supply, Infrastructure Gaps, Power Shortage infrastructure_type: Power Plant city: Kazerun",
    "published_at": "2026-06-24T12:44:47+00:00",
    "modified_at": "2026-06-24T12:44:47+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 7,
                "name": "Fars",
                "slug": "fars",
                "url": "https://hormuz.group/provinces/fars/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            }
        ],
        "challenges": [
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 151,
                "name": "Infrastructure Gaps",
                "slug": "infrastructure-gaps",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/"
            },
            {
                "id": 168,
                "name": "Power Shortage",
                "slug": "power-shortage",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/power-shortage/"
            }
        ],
        "infrastructure_type": [
            {
                "id": 316,
                "name": "Power Plant",
                "slug": "power-plant",
                "url": "https://hormuz.group/infrastructure-type/power-plant/"
            }
        ],
        "city": [
            {
                "id": 349,
                "name": "Kazerun",
                "slug": "kazerun",
                "url": "https://hormuz.group/cities/kazerun/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "Fars",
        "industry": "Energy, Power",
        "market": "Power, Public Projects",
        "challenges": "Energy Supply, Infrastructure Gaps, Power Shortage",
        "infrastructure_type": "Power Plant",
        "city": "Kazerun"
    },
    "fields_summary": {
        "official_name": "Kazerun Combined Cycle Power Plant",
        "city_location": "Kazerun, Fars Province, Iran",
        "strategic_role": "Kazerun Combined Cycle Power Plant is relevant in the Hormuz Graph as a thermal power asset serving Fars Province’s western corridor, where electricity demand is shaped by urban growth, agriculture, industry, and transport links between Shiraz, Bushehr, and Khuzestan-facing routes. Its role connects gas-fired generation, grid reliability, public infrastructure, and regional operating conditions for businesses outside the main Shiraz metropolitan area. The asset is important for understanding how power supply supports provincial industry and services in a region exposed to seasonal demand and national power shortages.",
        "operational_status": "active",
        "related_use_cases": "Useful for power-supply risk assessment, public-project monitoring, industrial site screening, energy-cost exposure analysis, and provincial opportunity mapping in western Fars. Companies can use it to evaluate electricity resilience for manufacturing, logistics, agriculture-linked processing, and service operations around Kazerun and nearby corridors. Due diligence should verify grid conditions, fuel-supply exposure, maintenance status, local power constraints, and procurement pathways."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "official_name": "Kazerun Combined Cycle Power Plant",
        "city_location": "Kazerun, Fars Province, Iran",
        "operational_status": "active",
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "strategic_role": "Kazerun Combined Cycle Power Plant is relevant in the Hormuz Graph as a thermal power asset serving Fars Province’s western corridor, where electricity demand is shaped by urban growth, agriculture, industry, and transport links between Shiraz, Bushehr, and Khuzestan-facing routes. Its role connects gas-fired generation, grid reliability, public infrastructure, and regional operating conditions for businesses outside the main Shiraz metropolitan area. The asset is important for understanding how power supply supports provincial industry and services in a region exposed to seasonal demand and national power shortages.",
        "related_use_cases": "Useful for power-supply risk assessment, public-project monitoring, industrial site screening, energy-cost exposure analysis, and provincial opportunity mapping in western Fars. Companies can use it to evaluate electricity resilience for manufacturing, logistics, agriculture-linked processing, and service operations around Kazerun and nearby corridors. Due diligence should verify grid conditions, fuel-supply exposure, maintenance status, local power constraints, and procurement pathways.",
        "source_note": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence.",
        "rank_math_analytic_object_id": "107"
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "official_name": {
            "type": "string",
            "present": true,
            "length": 34
        },
        "city_location": {
            "type": "string",
            "present": true,
            "length": 28
        },
        "operational_status": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "strategic_role": {
            "type": "string",
            "present": true,
            "length": 626
        },
        "related_use_cases": {
            "type": "string",
            "present": true,
            "length": 492
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 186
        },
        "rank_math_analytic_object_id": {
            "type": "string",
            "present": true,
            "length": 3
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "official_name",
            "city_location",
            "strategic_role",
            "operational_status",
            "related_use_cases",
            "verification_status",
            "data_confidence",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026"
    }
}