{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:infrastructure:parand-power-plant",
    "identifier": "hg:infrastructure:parand-power-plant",
    "dataset_type": "entity_dataset",
    "entity_type": "infrastructure",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:18+00:00",
    "name": "Parand Power Plant",
    "slug": "parand-power-plant",
    "status": "publish",
    "url": "https://hormuz.group/infrastructure/parand-power-plant/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/infrastructure/parand-power-plant.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/infrastructure/parand-power-plant",
    "summary": "",
    "machine_summary": "Parand Power Plant Parand Power Plant matters in the Hormuz Graph because it sits on Tehran’s southwestern growth belt, where residential expansion, logistics parks, industrial estates, rail-linked movement, and airport-adjacent development create rising electricity demand. Its role is not only grid generation; it connects the capital-region power system to Parand, Robat Karim, Imam Khomeini Airport logistics, and Tehran-facing enterprise demand. The asset is useful for reading how electricity resilience affects warehousing, commuter settlements, manufacturing, and service operations around one of Tehran Province’s most active expansion corridors. Parand Power Plant Parand, Tehran Province, Iran province: Tehran industry: Energy, Power market: Enterprise Demand, Power, Public Projects challenges: Energy Supply, Infrastructure Gaps, Power Shortage infrastructure_type: Power Plant",
    "published_at": "2026-06-24T12:44:47+00:00",
    "modified_at": "2026-06-24T12:44:47+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 3,
                "name": "Tehran",
                "slug": "tehran",
                "url": "https://hormuz.group/provinces/tehran/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 40,
                "name": "Enterprise Demand",
                "slug": "enterprise-demand",
                "url": "https://hormuz.group/market/enterprise-demand/"
            },
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            }
        ],
        "challenges": [
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 151,
                "name": "Infrastructure Gaps",
                "slug": "infrastructure-gaps",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/"
            },
            {
                "id": 168,
                "name": "Power Shortage",
                "slug": "power-shortage",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/power-shortage/"
            }
        ],
        "infrastructure_type": [
            {
                "id": 316,
                "name": "Power Plant",
                "slug": "power-plant",
                "url": "https://hormuz.group/infrastructure-type/power-plant/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "Tehran",
        "industry": "Energy, Power",
        "market": "Enterprise Demand, Power, Public Projects",
        "challenges": "Energy Supply, Infrastructure Gaps, Power Shortage",
        "infrastructure_type": "Power Plant"
    },
    "fields_summary": {
        "official_name": "Parand Power Plant",
        "city_location": "Parand, Tehran Province, Iran",
        "strategic_role": "Parand Power Plant matters in the Hormuz Graph because it sits on Tehran’s southwestern growth belt, where residential expansion, logistics parks, industrial estates, rail-linked movement, and airport-adjacent development create rising electricity demand. Its role is not only grid generation; it connects the capital-region power system to Parand, Robat Karim, Imam Khomeini Airport logistics, and Tehran-facing enterprise demand. The asset is useful for reading how electricity resilience affects warehousing, commuter settlements, manufacturing, and service operations around one of Tehran Province’s most active expansion corridors.",
        "operational_status": "active",
        "related_use_cases": "Useful for power-supply risk assessment, industrial and logistics site screening, real estate resilience review, public-project monitoring, and demand mapping for backup power, efficiency, and grid-support services. Analysts can use it to assess how electricity constraints affect Parand, airport-linked logistics, southwestern Tehran warehousing, and manufacturing operations. Due diligence should verify current grid role, fuel exposure, maintenance condition, local power shortages, and procurement pathways."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "official_name": "Parand Power Plant",
        "city_location": "Parand, Tehran Province, Iran",
        "operational_status": "active",
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "strategic_role": "Parand Power Plant matters in the Hormuz Graph because it sits on Tehran’s southwestern growth belt, where residential expansion, logistics parks, industrial estates, rail-linked movement, and airport-adjacent development create rising electricity demand. Its role is not only grid generation; it connects the capital-region power system to Parand, Robat Karim, Imam Khomeini Airport logistics, and Tehran-facing enterprise demand. The asset is useful for reading how electricity resilience affects warehousing, commuter settlements, manufacturing, and service operations around one of Tehran Province’s most active expansion corridors.",
        "related_use_cases": "Useful for power-supply risk assessment, industrial and logistics site screening, real estate resilience review, public-project monitoring, and demand mapping for backup power, efficiency, and grid-support services. Analysts can use it to assess how electricity constraints affect Parand, airport-linked logistics, southwestern Tehran warehousing, and manufacturing operations. Due diligence should verify current grid role, fuel exposure, maintenance condition, local power shortages, and procurement pathways.",
        "source_note": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence.",
        "rank_math_analytic_object_id": "108"
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "official_name": {
            "type": "string",
            "present": true,
            "length": 18
        },
        "city_location": {
            "type": "string",
            "present": true,
            "length": 29
        },
        "operational_status": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "strategic_role": {
            "type": "string",
            "present": true,
            "length": 640
        },
        "related_use_cases": {
            "type": "string",
            "present": true,
            "length": 511
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 186
        },
        "rank_math_analytic_object_id": {
            "type": "string",
            "present": true,
            "length": 3
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "official_name",
            "city_location",
            "strategic_role",
            "operational_status",
            "related_use_cases",
            "verification_status",
            "data_confidence",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026"
    }
}