{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:infrastructure:ramin-power-plant",
    "identifier": "hg:infrastructure:ramin-power-plant",
    "dataset_type": "entity_dataset",
    "entity_type": "infrastructure",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:18+00:00",
    "name": "Ramin Power Plant",
    "slug": "ramin-power-plant",
    "status": "publish",
    "url": "https://hormuz.group/infrastructure/ramin-power-plant/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/infrastructure/ramin-power-plant.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/infrastructure/ramin-power-plant",
    "summary": "",
    "machine_summary": "Ramin Power Plant Ramin Power Plant matters in the Hormuz Graph because it is tied to electricity resilience around Ahvaz and Khuzestan’s energy-intensive economy, where oil and gas services, steel activity, agriculture, urban demand, and extreme seasonal load pressure all depend on stable power. Its role connects public generation capacity, industrial operating conditions, heat-driven demand peaks, grid stress, and environmental exposure in southwest Iran. The asset is analytically useful because power reliability in Khuzestan directly affects production, water pumping, logistics, and enterprise continuity across a province central to national energy flows. Ramin Power Plant Ahvaz, Khuzestan Province, Iran province: Khuzestan industry: Energy, Power market: Enterprise Demand, Power, Public Projects challenges: Energy Supply, Environmental Stress, Power Shortage infrastructure_type: Power Plant city: Ahvaz",
    "published_at": "2026-06-24T12:44:47+00:00",
    "modified_at": "2026-06-24T12:44:47+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 5,
                "name": "Khuzestan",
                "slug": "khuzestan",
                "url": "https://hormuz.group/provinces/khuzestan/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 40,
                "name": "Enterprise Demand",
                "slug": "enterprise-demand",
                "url": "https://hormuz.group/market/enterprise-demand/"
            },
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            }
        ],
        "challenges": [
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 174,
                "name": "Environmental Stress",
                "slug": "environmental-stress",
                "url": "https://hormuz.group/challenges/resource-constraints/environmental-stress/"
            },
            {
                "id": 168,
                "name": "Power Shortage",
                "slug": "power-shortage",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/power-shortage/"
            }
        ],
        "infrastructure_type": [
            {
                "id": 316,
                "name": "Power Plant",
                "slug": "power-plant",
                "url": "https://hormuz.group/infrastructure-type/power-plant/"
            }
        ],
        "city": [
            {
                "id": 332,
                "name": "Ahvaz",
                "slug": "ahvaz",
                "url": "https://hormuz.group/cities/ahvaz/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "Khuzestan",
        "industry": "Energy, Power",
        "market": "Enterprise Demand, Power, Public Projects",
        "challenges": "Energy Supply, Environmental Stress, Power Shortage",
        "infrastructure_type": "Power Plant",
        "city": "Ahvaz"
    },
    "fields_summary": {
        "official_name": "Ramin Power Plant",
        "city_location": "Ahvaz, Khuzestan Province, Iran",
        "strategic_role": "Ramin Power Plant matters in the Hormuz Graph because it is tied to electricity resilience around Ahvaz and Khuzestan’s energy-intensive economy, where oil and gas services, steel activity, agriculture, urban demand, and extreme seasonal load pressure all depend on stable power. Its role connects public generation capacity, industrial operating conditions, heat-driven demand peaks, grid stress, and environmental exposure in southwest Iran. The asset is analytically useful because power reliability in Khuzestan directly affects production, water pumping, logistics, and enterprise continuity across a province central to national energy flows.",
        "operational_status": "active",
        "related_use_cases": "Useful for power-supply risk assessment, industrial site screening, energy-intensive operations review, public-project monitoring, environmental-risk assessment, and demand mapping for backup power or efficiency solutions in Khuzestan. Analysts can use it to evaluate how electricity constraints affect Ahvaz, steel and oilfield-service activity, agriculture, cold chains, and logistics. Due diligence should verify grid role, fuel exposure, maintenance conditions, local shortages, and procurement channels."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "official_name": "Ramin Power Plant",
        "city_location": "Ahvaz, Khuzestan Province, Iran",
        "operational_status": "active",
        "verification_status": "basic",
        "data_confidence": "high",
        "last_updated": "24/06/2026",
        "strategic_role": "Ramin Power Plant matters in the Hormuz Graph because it is tied to electricity resilience around Ahvaz and Khuzestan’s energy-intensive economy, where oil and gas services, steel activity, agriculture, urban demand, and extreme seasonal load pressure all depend on stable power. Its role connects public generation capacity, industrial operating conditions, heat-driven demand peaks, grid stress, and environmental exposure in southwest Iran. The asset is analytically useful because power reliability in Khuzestan directly affects production, water pumping, logistics, and enterprise continuity across a province central to national energy flows.",
        "related_use_cases": "Useful for power-supply risk assessment, industrial site screening, energy-intensive operations review, public-project monitoring, environmental-risk assessment, and demand mapping for backup power or efficiency solutions in Khuzestan. Analysts can use it to evaluate how electricity constraints affect Ahvaz, steel and oilfield-service activity, agriculture, cold chains, and logistics. Due diligence should verify grid role, fuel exposure, maintenance conditions, local shortages, and procurement channels.",
        "source_note": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence.",
        "rank_math_analytic_object_id": "105"
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "official_name": {
            "type": "string",
            "present": true,
            "length": 17
        },
        "city_location": {
            "type": "string",
            "present": true,
            "length": 31
        },
        "operational_status": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 4
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "strategic_role": {
            "type": "string",
            "present": true,
            "length": 650
        },
        "related_use_cases": {
            "type": "string",
            "present": true,
            "length": 508
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 186
        },
        "rank_math_analytic_object_id": {
            "type": "string",
            "present": true,
            "length": 3
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "official_name",
            "city_location",
            "strategic_role",
            "operational_status",
            "related_use_cases",
            "verification_status",
            "data_confidence",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "high",
        "last_updated": "24/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "high",
        "last_updated": "24/06/2026"
    }
}