{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:infrastructure:urmia-power-plant",
    "identifier": "hg:infrastructure:urmia-power-plant",
    "dataset_type": "entity_dataset",
    "entity_type": "infrastructure",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:18+00:00",
    "name": "Urmia Power Plant",
    "slug": "urmia-power-plant",
    "status": "publish",
    "url": "https://hormuz.group/infrastructure/urmia-power-plant/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/infrastructure/urmia-power-plant.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/infrastructure/urmia-power-plant",
    "summary": "",
    "machine_summary": "Urmia Power Plant Urmia Power Plant matters in the Hormuz Graph because it is tied to electricity resilience in West Azerbaijan, where demand comes from Urmia’s urban services, food processing, agriculture, cold chains, industrial estates, and border-region logistics. Its role connects public power supply, enterprise demand, seasonal load, fuel exposure, and operating reliability in a province shaped by dispersed settlements and trade corridors toward Turkey and Iraq-linked markets. The asset is useful for understanding how power constraints affect production, storage, and services in northwest Iran. Urmia Power Plant Urmia, West Azerbaijan Province, Iran province: West Azerbaijan industry: Energy, Power market: Enterprise Demand, Power, Public Projects challenges: Energy Supply, Infrastructure Gaps, Power Shortage infrastructure_type: Power Plant city: Urmia",
    "published_at": "2026-06-24T12:47:02+00:00",
    "modified_at": "2026-06-24T12:47:02+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 188,
                "name": "West Azerbaijan",
                "slug": "west-azerbaijan",
                "url": "https://hormuz.group/provinces/west-azerbaijan/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 40,
                "name": "Enterprise Demand",
                "slug": "enterprise-demand",
                "url": "https://hormuz.group/market/enterprise-demand/"
            },
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            }
        ],
        "challenges": [
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 151,
                "name": "Infrastructure Gaps",
                "slug": "infrastructure-gaps",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/"
            },
            {
                "id": 168,
                "name": "Power Shortage",
                "slug": "power-shortage",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/power-shortage/"
            }
        ],
        "infrastructure_type": [
            {
                "id": 316,
                "name": "Power Plant",
                "slug": "power-plant",
                "url": "https://hormuz.group/infrastructure-type/power-plant/"
            }
        ],
        "city": [
            {
                "id": 430,
                "name": "Urmia",
                "slug": "urmia",
                "url": "https://hormuz.group/cities/urmia/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "West Azerbaijan",
        "industry": "Energy, Power",
        "market": "Enterprise Demand, Power, Public Projects",
        "challenges": "Energy Supply, Infrastructure Gaps, Power Shortage",
        "infrastructure_type": "Power Plant",
        "city": "Urmia"
    },
    "fields_summary": {
        "official_name": "Urmia Power Plant",
        "city_location": "Urmia, West Azerbaijan Province, Iran",
        "strategic_role": "Urmia Power Plant matters in the Hormuz Graph because it is tied to electricity resilience in West Azerbaijan, where demand comes from Urmia’s urban services, food processing, agriculture, cold chains, industrial estates, and border-region logistics. Its role connects public power supply, enterprise demand, seasonal load, fuel exposure, and operating reliability in a province shaped by dispersed settlements and trade corridors toward Turkey and Iraq-linked markets. The asset is useful for understanding how power constraints affect production, storage, and services in northwest Iran.",
        "operational_status": "active",
        "related_use_cases": "Useful for power-supply risk assessment, industrial site screening, food-processing resilience review, cold-chain analysis, public-project monitoring, and demand mapping for backup power or efficiency solutions in West Azerbaijan. Analysts can use it to evaluate how electricity reliability affects Urmia, agricultural processing, border-linked warehousing, and regional logistics. Due diligence should verify grid role, fuel exposure, maintenance condition, shortage patterns, environmental constraints, and procurement channels."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "official_name": "Urmia Power Plant",
        "city_location": "Urmia, West Azerbaijan Province, Iran",
        "operational_status": "active",
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "strategic_role": "Urmia Power Plant matters in the Hormuz Graph because it is tied to electricity resilience in West Azerbaijan, where demand comes from Urmia’s urban services, food processing, agriculture, cold chains, industrial estates, and border-region logistics. Its role connects public power supply, enterprise demand, seasonal load, fuel exposure, and operating reliability in a province shaped by dispersed settlements and trade corridors toward Turkey and Iraq-linked markets. The asset is useful for understanding how power constraints affect production, storage, and services in northwest Iran.",
        "related_use_cases": "Useful for power-supply risk assessment, industrial site screening, food-processing resilience review, cold-chain analysis, public-project monitoring, and demand mapping for backup power or efficiency solutions in West Azerbaijan. Analysts can use it to evaluate how electricity reliability affects Urmia, agricultural processing, border-linked warehousing, and regional logistics. Due diligence should verify grid role, fuel exposure, maintenance condition, shortage patterns, environmental constraints, and procurement channels.",
        "source_note": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence.",
        "rank_math_analytic_object_id": "86"
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "official_name": {
            "type": "string",
            "present": true,
            "length": 17
        },
        "city_location": {
            "type": "string",
            "present": true,
            "length": 37
        },
        "operational_status": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "strategic_role": {
            "type": "string",
            "present": true,
            "length": 591
        },
        "related_use_cases": {
            "type": "string",
            "present": true,
            "length": 530
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 186
        },
        "rank_math_analytic_object_id": {
            "type": "string",
            "present": true,
            "length": 2
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "official_name",
            "city_location",
            "strategic_role",
            "operational_status",
            "related_use_cases",
            "verification_status",
            "data_confidence",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026"
    }
}