{
    "@context": {
        "schema": "https://schema.org/",
        "dct": "http://purl.org/dc/terms/",
        "hg": "https://hormuz.group/data/ns#"
    },
    "id": "hg:infrastructure:yazd-combined-cycle-power-plant",
    "identifier": "hg:infrastructure:yazd-combined-cycle-power-plant",
    "dataset_type": "entity_dataset",
    "entity_type": "infrastructure",
    "data_version": "2.0",
    "generated_by": "Hormuz Data Layer 0.2.1",
    "generated_at": "2026-07-04T02:51:18+00:00",
    "name": "Yazd Combined Cycle Power Plant",
    "slug": "yazd-combined-cycle-power-plant",
    "status": "publish",
    "url": "https://hormuz.group/infrastructure/yazd-combined-cycle-power-plant/",
    "json_url": "https://hormuz.group/wp-content/uploads/hormuz-data/cpt/infrastructure/yazd-combined-cycle-power-plant.json",
    "rest_url": "https://hormuz.group/wp-json/hormuz-data/v1/cpt/infrastructure/yazd-combined-cycle-power-plant",
    "summary": "",
    "machine_summary": "Yazd Combined Cycle Power Plant Yazd Combined Cycle Power Plant matters in the Hormuz Graph because it supports electricity demand in one of Iran’s most mining- and industry-oriented desert provinces, where ceramics, steel-related activity, textiles, mining services, urban demand, and water-stressed operations depend on reliable power. Its role connects enterprise demand, central Iran grid resilience, industrial estates, mining districts around Bafq and Ardakan, fuel exposure, and environmental constraints. The asset is analytically important because in Yazd, power reliability and water scarcity jointly shape industrial feasibility. Yazd Combined Cycle Power Plant Yazd, Yazd Province, Iran province: Yazd industry: Energy, Power market: Enterprise Demand, Power, Public Projects challenges: Energy Supply, Infrastructure Gaps, Power Shortage, Water Scarcity infrastructure_type: Power Plant city: Yazd",
    "published_at": "2026-06-24T12:47:01+00:00",
    "modified_at": "2026-06-24T12:47:01+00:00",
    "taxonomies": {
        "province": [
            {
                "id": 9,
                "name": "Yazd",
                "slug": "yazd",
                "url": "https://hormuz.group/provinces/yazd/"
            }
        ],
        "industry": [
            {
                "id": 13,
                "name": "Energy",
                "slug": "energy",
                "url": "https://hormuz.group/industry/energy/"
            },
            {
                "id": 85,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/industry/energy/power/"
            }
        ],
        "market": [
            {
                "id": 40,
                "name": "Enterprise Demand",
                "slug": "enterprise-demand",
                "url": "https://hormuz.group/market/enterprise-demand/"
            },
            {
                "id": 79,
                "name": "Power",
                "slug": "power",
                "url": "https://hormuz.group/market/public-projects/power/"
            },
            {
                "id": 41,
                "name": "Public Projects",
                "slug": "public-projects",
                "url": "https://hormuz.group/market/public-projects/"
            }
        ],
        "challenges": [
            {
                "id": 173,
                "name": "Energy Supply",
                "slug": "energy-supply",
                "url": "https://hormuz.group/challenges/resource-constraints/energy-supply/"
            },
            {
                "id": 151,
                "name": "Infrastructure Gaps",
                "slug": "infrastructure-gaps",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/"
            },
            {
                "id": 168,
                "name": "Power Shortage",
                "slug": "power-shortage",
                "url": "https://hormuz.group/challenges/infrastructure-gaps/power-shortage/"
            },
            {
                "id": 172,
                "name": "Water Scarcity",
                "slug": "water-scarcity",
                "url": "https://hormuz.group/challenges/resource-constraints/water-scarcity/"
            }
        ],
        "infrastructure_type": [
            {
                "id": 316,
                "name": "Power Plant",
                "slug": "power-plant",
                "url": "https://hormuz.group/infrastructure-type/power-plant/"
            }
        ],
        "city": [
            {
                "id": 359,
                "name": "Yazd",
                "slug": "yazd",
                "url": "https://hormuz.group/cities/yazd/"
            }
        ]
    },
    "taxonomy_labels": {
        "province": "Yazd",
        "industry": "Energy, Power",
        "market": "Enterprise Demand, Power, Public Projects",
        "challenges": "Energy Supply, Infrastructure Gaps, Power Shortage, Water Scarcity",
        "infrastructure_type": "Power Plant",
        "city": "Yazd"
    },
    "fields_summary": {
        "official_name": "Yazd Combined Cycle Power Plant",
        "city_location": "Yazd, Yazd Province, Iran",
        "strategic_role": "Yazd Combined Cycle Power Plant matters in the Hormuz Graph because it supports electricity demand in one of Iran’s most mining- and industry-oriented desert provinces, where ceramics, steel-related activity, textiles, mining services, urban demand, and water-stressed operations depend on reliable power. Its role connects enterprise demand, central Iran grid resilience, industrial estates, mining districts around Bafq and Ardakan, fuel exposure, and environmental constraints. The asset is analytically important because in Yazd, power reliability and water scarcity jointly shape industrial feasibility.",
        "operational_status": "active",
        "related_use_cases": "Useful for industrial power-risk assessment, mining and materials supply-chain review, site screening, public-project monitoring, environmental-risk analysis, and demand mapping for efficiency, backup-power, or maintenance services in Yazd Province. Companies can use it to evaluate power exposure for ceramics, mining services, warehouses, steel-linked suppliers, and urban operations. Practical checks should verify grid role, fuel exposure, water-related constraints, maintenance condition, local shortage patterns, and procurement opportunities."
    },
    "fields": {
        "rank_math_internal_links_processed": "1",
        "wp_statistics_words_count": "0",
        "official_name": "Yazd Combined Cycle Power Plant",
        "city_location": "Yazd, Yazd Province, Iran",
        "operational_status": "active",
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "strategic_role": "Yazd Combined Cycle Power Plant matters in the Hormuz Graph because it supports electricity demand in one of Iran’s most mining- and industry-oriented desert provinces, where ceramics, steel-related activity, textiles, mining services, urban demand, and water-stressed operations depend on reliable power. Its role connects enterprise demand, central Iran grid resilience, industrial estates, mining districts around Bafq and Ardakan, fuel exposure, and environmental constraints. The asset is analytically important because in Yazd, power reliability and water scarcity jointly shape industrial feasibility.",
        "related_use_cases": "Useful for industrial power-risk assessment, mining and materials supply-chain review, site screening, public-project monitoring, environmental-risk analysis, and demand mapping for efficiency, backup-power, or maintenance services in Yazd Province. Companies can use it to evaluate power exposure for ceramics, mining services, warehouses, steel-linked suppliers, and urban operations. Practical checks should verify grid role, fuel exposure, water-related constraints, maintenance condition, local shortage patterns, and procurement opportunities.",
        "source_note": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence.",
        "rank_math_analytic_object_id": "94"
    },
    "field_profile": {
        "rank_math_internal_links_processed": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "wp_statistics_words_count": {
            "type": "string",
            "present": true,
            "length": 1
        },
        "official_name": {
            "type": "string",
            "present": true,
            "length": 31
        },
        "city_location": {
            "type": "string",
            "present": true,
            "length": 25
        },
        "operational_status": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "verification_status": {
            "type": "string",
            "present": true,
            "length": 5
        },
        "data_confidence": {
            "type": "string",
            "present": true,
            "length": 6
        },
        "last_updated": {
            "type": "string",
            "present": true,
            "length": 10
        },
        "strategic_role": {
            "type": "string",
            "present": true,
            "length": 610
        },
        "related_use_cases": {
            "type": "string",
            "present": true,
            "length": 549
        },
        "source_note": {
            "type": "string",
            "present": true,
            "length": 186
        },
        "rank_math_analytic_object_id": {
            "type": "string",
            "present": true,
            "length": 2
        }
    },
    "sources": [
        {
            "type": "note",
            "value": "Based on public infrastructure, provincial, industrial, and market-context information. Further verification is required before treating this profile as verified investment intelligence."
        }
    ],
    "quality": {
        "required_fields": [
            "official_name",
            "city_location",
            "strategic_role",
            "operational_status",
            "related_use_cases",
            "verification_status",
            "data_confidence",
            "source_note",
            "last_updated"
        ],
        "missing_required_fields": [],
        "missing_required_count": 0,
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026",
        "stale_over_180_days": false,
        "quality_score": 100
    },
    "verification": {
        "verification_status": "basic",
        "data_confidence": "medium",
        "last_updated": "24/06/2026"
    }
}