Infrastructure profileActive

Rudbar Lorestan Dam

Rudbar Lorestan Dam, also referred to as Rudbar Aligudarz Dam and Rudbar Lorestan Hydroelectric Plant, is a confirmed dam and hydropower asset near Aligudarz in Lorestan Province. Available evidence reports 450 MW of installed capacity and commissioning in 2017. Annual generation of 986 GWh is reported by one Persian-language secondary source for 2017 and has not been independently corroborated in the supplied evidence.

StatusActive
VerificationBasic
ConfidenceMedium
Updated19/07/2026
Strategic Layer

Strategic and market-access role

Rudbar Lorestan Dam matters in the Hormuz Graph as a mountain-region water and hydropower asset in eastern Lorestan, where river-basin management intersects with electricity generation, rural water conditions, agriculture, and environmental stress. Its role differs from Khuzestan’s large lowland dams because it sits in an upstream Zagros setting near Aligudarz, shaping flows before water moves into wider western and southwestern systems. The asset connects hydropower context, water allocation, local agriculture, public infrastructure, and provincial resilience in a less industrial but water-sensitive region. A provincial hydropower-generation asset in Lorestan’s power infrastructure.

OPERATING PROFILE

Operations, capacity & connectivity

Related use cases

Useful for hydropower context analysis, water-risk assessment, public-project monitoring, agricultural resilience review, environmental-risk screening, and provincial infrastructure mapping in Lorestan. Analysts can use it to understand how upstream water control affects local development, downstream allocations, rural demand, and grid resilience. Practical work should verify reservoir conditions, generation status, drought exposure, environmental impacts, local water-use priorities, and procurement channels for maintenance or monitoring services.

Capacity and service area

Capacity: 450 MW installed capacity, reported for 2017.

Industries served

Power generation; water infrastructure.

CONTROL & DEVELOPMENT

Ownership, operation & expansion

Owner and operator

Owner: Iran Water and Power Resources Development Co (reported as of 2023). Operator: Iran Water and Power Resources Development Co was identified as operator in sources current to 2023. The evidence does not confirm the current operating arrangement after an initial three-year O&M contract with China Gezhouba Group.

Opening or commissioning

2017. The dam completion date is reported as 15 September 2016; the hydroelectric plant began operating on 31 May 2017, with commercial operation reported in August 2017.

DECISION RISKS

Constraints, risk & compliance

Key risks and compliance considerations

Published source titles in the evidence pack indicate environmental, geological, hydrological and dam-safety considerations, but the supplied evidence does not establish their current status or materiality.

Related context

Connected Intelligence

Relevant geography, industry, market and execution context for this profile.

Common questions

Frequently asked questions

Direct answers to the questions most likely to arise when reviewing this profile.

Where is Rudbar Lorestan Dam located?

Rudbar Lorestan Dam is near Aligudarz in Lorestan Province, Iran.

What is the reported capacity of Rudbar Lorestan Dam?

The supplied evidence reports installed hydropower capacity of 450 MW for 2017.

When was Rudbar Lorestan Dam commissioned?

The hydroelectric plant began operating on 31 May 2017, with commercial operation reported in August 2017. The dam itself was completed on 15 September 2016.

Who owns Rudbar Lorestan Dam?

Iran Water and Power Resources Development Co is reported as the owner as of 2023.