⁦Infrastructure profile⁩⁦Active⁩

⁦Zahedan Rail and Logistics Node⁩

⁦Zahedan Railway Station is the official entity behind the descriptive⁩ “⁦Zahedan Rail and Logistics Node⁩” ⁦entry⁩. ⁦The active station handles passenger and freight rail services⁩, ⁦customs facilities and rail-road intermodal transfer⁩. ⁦It is linked to Iran’s railway network through Kerman and to Pakistan Railways through Mirjaveh⁩.

⁦Status⁩⁦Active⁩
⁦Verification⁩⁦Basic⁩
⁦Confidence⁩⁦Medium⁩
⁦Updated⁩19/07/2026
⁦Strategic Layer⁩

⁦Strategic and market-access role⁩

⁦Zahedan Rail and Logistics Node matters in the Hormuz Graph because Zahedan sits at the junction of southeast Iran’s rail⁩, ⁦road⁩, ⁦and border-corridor logic⁩, ⁦linking Pakistan-facing movement⁩, ⁦inland routes toward Kerman and central Iran⁩, ⁦and longer-term Chabahar corridor relevance⁩. ⁦Its role connects rail freight⁩, ⁦road transfer⁩, ⁦warehousing demand⁩, ⁦customs-sensitive movement⁩, ⁦and provincial distribution in a region where distance and infrastructure depth define commercial feasibility⁩. ⁦The asset is especially important for assessing how goods can move between eastern borders⁩, ⁦mineral and consumer markets⁩, ⁦and Iran’s national logistics network⁩. ⁦Provides a rail interface between Iran’s standard-gauge network and the Pakistan-facing broad-gauge corridor at Mirjaveh⁩. ⁦The station is relevant to transit between Iran and Pakistan and to regional logistics in Sistan and Baluchestan⁩.

⁦OPERATING PROFILE⁩

⁦Operations⁩, ⁦capacity⁩ &⁦amp⁩; ⁦connectivity⁩

⁦Related use cases⁩

⁦Useful for rail-road route selection⁩, ⁦southeast corridor planning⁩, ⁦warehouse-location screening⁩, ⁦freight partner search⁩, ⁦customs and compliance review⁩, ⁦and comparison of Zahedan⁩, ⁦Chabahar⁩, ⁦Mirjaveh⁩, ⁦and Kerman-linked logistics options⁩. ⁦Analysts can use it to evaluate cargo suitability⁩, ⁦border connectivity⁩, ⁦transshipment needs⁩, ⁦and execution risk⁩. ⁦Field checks should verify active rail services⁩, ⁦terminal facilities⁩, ⁦storage availability⁩, ⁦trucking reliability⁩, ⁦documentation rules⁩, ⁦security exposure⁩, ⁦and operator depth⁩.

⁦Capacity and service area⁩

⁦Service area⁩: ⁦Zahedan and Sistan and Baluchestan Province⁩, ⁦with rail connectivity toward Kerman and the Pakistan-facing corridor via Mirjaveh⁩.

⁦Connected modes⁩

⁦Rail⁩, ⁦road and customs-linked intermodal transfer⁩.

⁦CONTROL⁩ &⁦amp⁩; ⁦DEVELOPMENT⁩

⁦Ownership⁩, ⁦operation⁩ &⁦amp⁩; ⁦expansion⁩

⁦Opening or commissioning⁩

⁦The Mirjaveh⁩–⁦Zahedan railway line and station opened in 1919⁩. ⁦The Kerman⁩–⁦Zahedan railway line opened in 2009⁩.

⁦Expansion and development projects⁩

⁦The Zahedan⁩–⁦Chabahar railway line was under construction as of 2023⁩.

⁦DECISION RISKS⁩

⁦Constraints⁩, ⁦risk⁩ &⁦amp⁩; ⁦compliance⁩

⁦Operational constraints⁩

⁦The network involves a gauge break between Iran’s 1⁩,435 ⁦mm standard gauge and Pakistan’s 1⁩,676 ⁦mm broad gauge⁩, ⁦requiring a transfer solution for through rail movements⁩.

⁦Related context⁩

⁦Connected Intelligence⁩

⁦Relevant geography⁩, ⁦industry⁩, ⁦market and execution context for this profile⁩.

⁦Common questions⁩

⁦Frequently asked questions⁩

⁦Direct answers to the questions most likely to arise when reviewing this profile⁩.

⁦What is Zahedan Railway Station⁩?

⁦Zahedan Railway Station is an active rail station and intermodal transfer point in Zahedan⁩, ⁦Sistan and Baluchestan Province⁩. ⁦The⁩ “⁦Zahedan Rail and Logistics Node⁩” ⁦label is descriptive rather than the station’s official name⁩.

⁦How does Zahedan connect to Pakistan by rail⁩?

⁦The station connects to the Pakistan Railways corridor through Mirjaveh⁩, ⁦linking with the Quetta⁩–⁦Taftan line⁩. ⁦Movements face a gauge break between Iran’s 1⁩,435 ⁦mm standard gauge and Pakistan’s 1⁩,676 ⁦mm broad gauge⁩.

⁦What rail links serve Zahedan⁩?

⁦Zahedan is connected to the Iranian railway network through the Kerman⁩–⁦Zahedan line⁩, ⁦opened in 2009⁩, ⁦and to the Mirjaveh⁩–⁦Zahedan line⁩, ⁦whose station and line opened in 1919⁩.

⁦Is the Zahedan⁩–⁦Chabahar railway complete⁩?

⁦No completion status was verified in the supplied evidence⁩. ⁦The line was reported as under construction as of 2023⁩.