⁦Infrastructure profile⁩⁦Active⁩

⁦Dez Dam⁩

⁦Commissioned in 1963⁩, ⁦Dez Dam combines hydropower generation⁩, ⁦reservoir storage⁩, ⁦irrigation supply and flood control⁩. ⁦Its decision relevance rests on the interaction between basin water availability⁩, ⁦sediment management⁩, ⁦agricultural water demand and electricity-system needs⁩.

⁦Status⁩⁦Active⁩
⁦Verification⁩⁦Basic⁩
⁦Confidence⁩⁦High⁩
⁦Updated⁩19/07/2026
⁦Strategic Layer⁩

⁦Strategic and market-access role⁩

⁦Dez Dam is a high-relevance water and power asset in the Hormuz Graph because it sits on one of Khuzestan’s major river systems⁩, ⁦linking upstream water control to electricity generation⁩, ⁦agricultural irrigation⁩, ⁦urban demand⁩, ⁦and industrial resilience in southwest Iran⁩. ⁦Its role is especially important in a province where oil⁩, ⁦gas⁩, ⁦agriculture⁩, ⁦steel⁩, ⁦and population centers all depend on water and power reliability⁩. ⁦The asset connects public infrastructure⁩, ⁦environmental stress⁩, ⁦river-basin management⁩, ⁦and productive land use rather than functioning as a standalone commercial project⁩. ⁦Supports electricity supply to the national grid while regulating water for irrigation and flood management in southwest Iran⁩.

⁦OPERATING PROFILE⁩

⁦Operations⁩, ⁦capacity⁩ &⁦amp⁩; ⁦connectivity⁩

⁦Related use cases⁩

⁦Useful for water-risk assessment⁩, ⁦hydropower and utility-context analysis⁩, ⁦agricultural supply-chain screening⁩, ⁦industrial site risk review⁩, ⁦and public-project monitoring in Khuzestan⁩. ⁦Analysts can use it to understand how river regulation and power infrastructure affect downstream farming⁩, ⁦urban services⁩, ⁦energy-intensive industries⁩, ⁦and environmental constraints⁩. ⁦Any project-level decision should verify current water conditions⁩, ⁦reservoir management⁩, ⁦grid role⁩, ⁦and public-sector procurement pathways⁩.

⁦Capacity and service area⁩

⁦Capacity⁩: 520 ⁦MW installed hydropower capacity across eight 65 MW units⁩. ⁦Reservoir storage capacity⁩: 3.3 ⁦billion cubic metres⁩. ⁦Service area⁩: ⁦Primarily Khuzestan Province for irrigation and power supply to the national grid⁩. ⁦Flood-control benefits extend across the lower Dez and Karun river plains⁩.

⁦Industries served⁩

⁦Power generation⁩; ⁦irrigated agriculture⁩; ⁦water management⁩.

⁦CONTROL⁩ &⁦amp⁩; ⁦DEVELOPMENT⁩

⁦Ownership⁩, ⁦operation⁩ &⁦amp⁩; ⁦expansion⁩

⁦Owner and operator⁩

⁦Owner⁩: ⁦Ministry of Energy⁩, ⁦Government of Iran⁩. ⁦Operator⁩: ⁦Iran Water and Power Resources Development Company⁩ (⁦IWPRDC⁩), ⁦a subsidiary of Iran’s Ministry of Energy⁩.

⁦Opening or commissioning⁩

1963

⁦Expansion and development projects⁩

⁦No major project to increase generating capacity was identified as of 19 July 2026⁩. ⁦Maintenance and rehabilitation activities are ongoing⁩.

⁦DECISION RISKS⁩

⁦Constraints⁩, ⁦risk⁩ &⁦amp⁩; ⁦compliance⁩

⁦Operational constraints⁩

⁦Water availability is exposed to drought conditions in the Dez River basin and upstream water-management practices⁩. ⁦Reservoir siltation is also a long-term concern⁩; ⁦academic evidence cites average sedimentation of 15⁩–20 ⁦million cubic metres per year based on 2005 data⁩.

⁦Key risks and compliance considerations⁩

⁦Hydrological variability and drought can constrain available water for generation⁩, ⁦irrigation and flood-control operations⁩. ⁦Long-term sedimentation may reduce effective reservoir storage⁩.

⁦Related context⁩

⁦Connected Intelligence⁩

⁦Relevant geography⁩, ⁦industry⁩, ⁦market and execution context for this profile⁩.

⁦Common questions⁩

⁦Frequently asked questions⁩

⁦Direct answers to the questions most likely to arise when reviewing this profile⁩.

⁦What is the installed power capacity of Dez Dam⁩?

⁦Dez Dam has 520 MW of installed hydropower capacity⁩, ⁦comprising eight 65 MW generating units⁩.

⁦What functions does Dez Dam serve⁩?

⁦The dam combines hydropower generation⁩, ⁦irrigation-water supply and flood control⁩. ⁦It supports irrigation for approximately 125⁩,000 ⁦hectares in the Dez and Karkheh irrigation networks⁩.

⁦Who operates Dez Dam⁩?

⁦Dez Dam is operated by the Iran Water and Power Resources Development Company⁩ (⁦IWPRDC⁩), ⁦a subsidiary of Iran’s Ministry of Energy⁩.

⁦What are the principal operational constraints⁩?

⁦Key constraints include drought-related water availability in the Dez River basin⁩, ⁦upstream water-management practices and long-term reservoir sedimentation⁩. ⁦The cited sedimentation rate of 15⁩–20 ⁦million cubic metres per year is based on 2005 data⁩.