Infrastructure profileActive

Ramin Power Plant

Ramin Power Plant is a supercritical steam-turbine thermal plant in Veys, near Ahvaz. It has six steam units and an operator-reported installed capacity of 1,850 MW. It entered operation in 1979 and uses natural gas as its primary fuel, with fuel oil for emergency backup.

StatusActive
VerificationBasic
ConfidenceHigh
Updated19/07/2026
Strategic Layer

Strategic and market-access role

Ramin Power Plant matters in the Hormuz Graph because it is tied to electricity resilience around Ahvaz and Khuzestan’s energy-intensive economy, where oil and gas services, steel activity, agriculture, urban demand, and extreme seasonal load pressure all depend on stable power. Its role connects public generation capacity, industrial operating conditions, heat-driven demand peaks, grid stress, and environmental exposure in southwest Iran. The asset is analytically useful because power reliability in Khuzestan directly affects production, water pumping, logistics, and enterprise continuity across a province central to national energy flows. Grid-connected generation asset. Secondary evidence describes connections through two 230 kV transmission substations: phases 1 and 2 for units 1–4, and phase 3 for units 5–6.

OPERATING PROFILE

Operations, capacity & connectivity

Related use cases

Useful for power-supply risk assessment, industrial site screening, energy-intensive operations review, public-project monitoring, environmental-risk assessment, and demand mapping for backup power or efficiency solutions in Khuzestan. Analysts can use it to evaluate how electricity constraints affect Ahvaz, steel and oilfield-service activity, agriculture, cold chains, and logistics. Due diligence should verify grid role, fuel exposure, maintenance conditions, local shortages, and procurement channels.

Capacity and service area

Capacity: 1,850 MW from six steam units, according to the plant’s company profile. Several secondary sources report 1,903 MW; the basis for the difference is not clear in the reviewed evidence. Service area: Khuzestan Province and the national grid. Secondary reporting estimates that the plant supplies approximately 25% of Khuzestan electricity demand and 2% of the national grid; these shares should be treated as reported estimates rather than current dispatch data.

CONTROL & DEVELOPMENT

Ownership, operation & expansion

Opening or commissioning

1979 (construction began in 1974).

Expansion and development projects

The reviewed evidence refers to an expansion target of 2,510 MW, but does not establish the project’s current status or completion date.

DECISION RISKS

Constraints, risk & compliance

Operational constraints

The plant primarily uses natural gas, with fuel oil designated for emergency backup. Actual availability and dispatch conditions were not established in the reviewed evidence.

Key risks and compliance considerations

Decision-makers should assess gas availability, emergency fuel-oil reliance, unit condition, transmission availability and the effect of high ambient temperatures on operating performance.

Related context

Connected Intelligence

Relevant geography, industry, market and execution context for this profile.

Common questions

Frequently asked questions

Direct answers to the questions most likely to arise when reviewing this profile.

Where is Ramin Power Plant located?

The plant is in Veys, Khuzestan Province, on the right bank of the Karoon River, approximately 20 km northeast of Ahvaz.

What is the capacity of Ramin Power Plant?

The plant’s company profile reports 1,850 MW of installed capacity from six steam units. Some secondary sources cite 1,903 MW, but the reason for this difference is not clear in the reviewed evidence.

What fuel does Ramin Power Plant use?

Natural gas is the primary fuel. Fuel oil is identified as emergency backup fuel.

When did Ramin Power Plant begin operating?

Construction began in 1974 and the plant became operational in 1979.