⁦Infrastructure profile⁩⁦Active⁩

⁦Marun Dam⁩

⁦Marun Dam is a rockfill-earth dam with a clay core⁩. ⁦It is 165 metres high from foundation and has a 345-metre crest length⁩.

⁦Status⁩⁦Active⁩
⁦Verification⁩⁦Basic⁩
⁦Confidence⁩⁦High⁩
⁦Updated⁩19/07/2026
⁦Strategic Layer⁩

⁦Strategic and market-access role⁩

⁦Marun Dam matters in the Hormuz Graph as a water and hydropower asset tied to eastern Khuzestan’s Marun-Jarahi basin⁩, ⁦where agriculture⁩, ⁦urban water demand⁩, ⁦electricity generation⁩, ⁦and downstream environmental stress overlap⁩. ⁦Its role is distinct from Karun and Karkheh dams because it directly affects the Behbahan-side agricultural economy and water conditions in eastern and southeastern Khuzestan⁩. ⁦The asset connects river regulation⁩, ⁦irrigation exposure⁩, ⁦food-production resilience⁩, ⁦public utility pressure⁩, ⁦hydropower context⁩, ⁦and industrial operating risk in a province where water scarcity can quickly become an economic constraint⁩.

⁦OPERATING PROFILE⁩

⁦Operations⁩, ⁦capacity⁩ &⁦amp⁩; ⁦connectivity⁩

⁦Related use cases⁩

⁦Useful for basin-level water-risk assessment⁩, ⁦hydropower context analysis⁩, ⁦agricultural supply-chain screening⁩, ⁦public-project monitoring⁩, ⁦and site-risk evaluation around Behbahan and eastern Khuzestan⁩. ⁦Analysts can use it to assess how irrigation allocations and reservoir conditions affect farming⁩, ⁦urban services⁩, ⁦logistics⁩, ⁦and nearby industrial activity⁩. ⁦Practical work should verify current reservoir levels⁩, ⁦drought exposure⁩, ⁦grid role⁩, ⁦downstream environmental impacts⁩, ⁦and water-allocation rules⁩.

⁦Capacity and service area⁩

⁦Capacity⁩: 150 ⁦MW installed hydropower capacity⁩ (⁦two 75 MW Francis turbines⁩). ⁦Total reservoir volume⁩: 1.25 ⁦billion cubic metres⁩. ⁦Service area⁩: ⁦Behbahan and agricultural land covered by the project’s stated irrigation function⁩.

⁦Industries served⁩

⁦Agriculture⁩; ⁦water utilities⁩; ⁦power generation⁩.

⁦CONTROL⁩ &⁦amp⁩; ⁦DEVELOPMENT⁩

⁦Ownership⁩, ⁦operation⁩ &⁦amp⁩; ⁦expansion⁩

⁦Owner and operator⁩

⁦Owner⁩: ⁦Khuzestan Water⁩ &⁦amp⁩; ⁦Power Authority⁩. ⁦Operator⁩: ⁦Khuzestan Water⁩ &⁦amp⁩; ⁦Power Authority⁩.

⁦Opening or commissioning⁩

⁦The dam was completed in 1998⁩. ⁦The associated power plant was commissioned in 2004⁩.

⁦Related context⁩

⁦Connected Intelligence⁩

⁦Relevant geography⁩, ⁦industry⁩, ⁦market and execution context for this profile⁩.

⁦Common questions⁩

⁦Frequently asked questions⁩

⁦Direct answers to the questions most likely to arise when reviewing this profile⁩.

⁦Where is Marun Dam located⁩?

⁦Marun Dam is located approximately 15⁩–19 ⁦km northeast of Behbahan in Khuzestan Province⁩, ⁦Iran⁩.

⁦What is Marun Dam used for⁩?

⁦Its stated purposes are irrigation of 55⁩,000 ⁦hectares of agricultural land⁩, ⁦drinking-water supply for Behbahan⁩, ⁦flood control and hydroelectric generation⁩.

⁦What is the hydropower capacity of Marun Dam⁩?

⁦The associated power plant has 150 MW of installed capacity⁩, ⁦comprising two 75 MW Francis turbines⁩.

⁦Who owns and operates Marun Dam⁩?

⁦The Khuzestan Water⁩ &⁦amp⁩; ⁦Power Authority is identified as the owner and operator⁩.