⁦Infrastructure profile⁩⁦Active⁩

⁦Mishdovan Iron Ore Mine⁩

⁦The asset uses stepped open-pit mining⁩. ⁦For 2023⁩, ⁦the operator reported approximately 4.4 million tonnes of remaining reserves at an average iron content of 41.05⁩% ⁦under its current plan⁩, ⁦while an October 2022 mine plan reported approximately 5.3 million tonnes at 35.1⁩% ⁦iron⁩. ⁦The processing line is reported to receive ore averaging 32⁩% ⁦iron and produce an enriched product of about 43⁩% ⁦iron at approximately 70⁩% ⁦recovery⁩.

⁦Status⁩⁦Active⁩
⁦Verification⁩⁦Basic⁩
⁦Confidence⁩⁦Medium⁩
⁦Updated⁩19/07/2026
⁦Strategic Layer⁩

⁦Strategic and market-access role⁩

⁦Mishdovan Iron Ore Mine matters in the Hormuz Graph as one of the iron-ore nodes around Bafq⁩, ⁦a mining district central to Yazd Province’s metals supply chain⁩. ⁦Its role connects ore extraction⁩, ⁦mining services⁩, ⁦rail and road freight⁩, ⁦processing demand⁩, ⁦industrial inputs⁩, ⁦and steel-sector material flows⁩. ⁦The asset is useful because it adds granularity to the Bafq cluster rather than treating Yazd mining as a single large-mine story⁩. ⁦It also highlights constraints around water⁩, ⁦energy⁩, ⁦environmental pressure⁩, ⁦and logistics reliability in central Iran⁩. ⁦The operator states that the mine supplies raw materials to Iran’s steel industry⁩. ⁦Specific customers⁩, ⁦transport arrangements and market routes were not identified⁩.

⁦OPERATING PROFILE⁩

⁦Operations⁩, ⁦capacity⁩ &⁦amp⁩; ⁦connectivity⁩

⁦Related use cases⁩

⁦Useful for iron-ore supply-chain mapping⁩, ⁦mining-services screening⁩, ⁦equipment and maintenance demand analysis⁩, ⁦materials sourcing⁩, ⁦freight-route review⁩, ⁦and environmental-risk assessment around Bafq⁩. ⁦Analysts can compare Mishdovan with Choghart⁩, ⁦Chadormalu⁩, ⁦Esfordi⁩, ⁦and Koushk to understand different mineral flows and service needs⁩. ⁦Site-level work should verify current operations⁩, ⁦processing links⁩, ⁦procurement access⁩, ⁦transport arrangements⁩, ⁦water exposure⁩, ⁦and compliance requirements⁩.

⁦Capacity and service area⁩

⁦Capacity⁩: ⁦Extraction capacity⁩: 750,000 ⁦tonnes per year⁩ (2023). ⁦The crushing and beneficiation line is also reported at 750⁩,000 ⁦tonnes per year⁩. ⁦An earlier 500⁩,000-⁦tonne-per-year processing figure is reported by the operator but is undated⁩. ⁦Service area⁩: ⁦Bafq mining district and Iranian steel-sector raw-material demand⁩.

⁦Industries served⁩

⁦Iron ore mining⁩, ⁦crushing and beneficiation⁩, ⁦and steel raw materials⁩.

⁦CONTROL⁩ &⁦amp⁩; ⁦DEVELOPMENT⁩

⁦Ownership⁩, ⁦operation⁩ &⁦amp⁩; ⁦expansion⁩

⁦Owner and operator⁩

⁦Owner⁩: ⁦Nozuhur Kavir Bafgh Mining Industries Company describes itself as the investor and operator⁩. ⁦Global Energy Monitor separately reports Bafq Mining Co as owner⁩; ⁦the legal relationship between the companies is not confirmed⁩. ⁦Operator⁩: ⁦Nozuhur Kavir Bafgh Mining Industries Company⁩ (صنایع معدنی نوظهور کویر بافق), ⁦which took over operation in 2018⁩.

⁦Opening or commissioning⁩

2009 (1388 ⁦SH⁩).

⁦Expansion and development projects⁩

⁦No discrete expansion project was verified⁩. ⁦The operator reports updated mine planning and ongoing extraction activity⁩.

⁦DECISION RISKS⁩

⁦Constraints⁩, ⁦risk⁩ &⁦amp⁩; ⁦compliance⁩

⁦Operational constraints⁩

⁦The mine is in a dry desert setting⁩. ⁦The operator reports summer temperatures up to 45⁩°⁦C⁩, ⁦winter temperatures down to⁩ -10°⁦C⁩, ⁦and irregular annual rainfall of 50⁩–100 ⁦mm⁩. ⁦Site-specific energy⁩, ⁦water and logistics constraints were not verified⁩.

⁦Key risks and compliance considerations⁩

⁦Mine-plan and reserve figures vary by date and scope⁩. ⁦Ownership is not fully resolved between first-party and third-party sources⁩. ⁦Site-specific environmental⁩, ⁦energy⁩, ⁦logistics and market-access risks require further diligence⁩.

⁦Related context⁩

⁦Connected Intelligence⁩

⁦Relevant geography⁩, ⁦industry⁩, ⁦market and execution context for this profile⁩.

⁦Common questions⁩

⁦Frequently asked questions⁩

⁦Direct answers to the questions most likely to arise when reviewing this profile⁩.

⁦Who operates Mishdovan Iron Ore Mine⁩?

⁦Nozuhur Kavir Bafgh Mining Industries Company is reported as the current operator and states that it took over operation in 2018⁩.

⁦What is the reported capacity of Mishdovan Iron Ore Mine⁩?

⁦For 2023⁩, ⁦extraction capacity was reported at 750⁩,000 ⁦tonnes per year⁩. ⁦The crushing and beneficiation line was also reported at 750⁩,000 ⁦tonnes per year⁩.

⁦When did Mishdovan Iron Ore Mine begin operating⁩?

⁦The operator reports that the mine began operations in 2009⁩ (1388 ⁦SH⁩).

⁦What mining method is used at Mishdovan⁩?

⁦The operator reports stepped open-pit mining⁩.